28 Davis – Spray Rail Repair/Replacement

The spray rails on this boat had seen better days. The port side was starting to separate from the hull. Starboard side was badly rotten with extensive worm damage. The decision was made to repair the port side and replace…

exc-5bf5c5bf575d1fb912a8bc41
exc-5bf5c9520e2e7291d05d7f52
exc-5bf5c9510ebbe86aa0fb33d6
exc-5bf5c951032be475504af1c3
exc-5bf5c95021c67c311fe6c267
exc-5bf5c950aa4a99960c6a42b4
exc-5bf5c94f21c67c311fe6c229
exc-5bf5c94f4ae237ba4c1effd1
exc-5bf5c94f21c67c311fe6c235
exc-5bf5c94e4d7a9c66408b675d
exc-5bf5c94e032be475504af19f
exc-5bf5c94d562fa7d6bd37315a
exc-5bf5c94c1ae6cf706030cff0
exc-5bf5c94bb8a0458f948bcd04
exc-5bf5c94b4d7a9c66408b6746
exc-5bf5c87c8985836fc19a4da6

55′ Rybovich – Structural Repairs & Interior Woodwork

Phase #1 Shower RebuildA faulty sliding window had allowed rain water to cause significant rot damage to the shower walls and floor.  All rot was cut out of the shower and surrounding areas.  New marine grade ply and solid mahogany…

41′ Morgan – Structural Repairs (April & May 2018)

This boat was in great condition overall. It had spent its whole life in Canada on fresh water. The new owners were committed to make the perfect live-aboard out of her. First priority, was to reconfigure the forward cabin into…

65′ Chris Craft Roamer – Custom Galley Cabinets

The boat owner was looking to increase storage space and improve the aesthetics of the galley.  Over the years poorly built, non-matching woodwork had found it's way on board.  This would all be demoed to achieve the owners goal of…

23′ Mako – Rocket Launcher & Dash Panel

Simple project of fabricating teak accent pieces to be installed and finished by the owner.  This required making patterns to capture the existing dimensions and rod holder angles.  1" material milled down to less than 3/4".  Should really make the…