55’ Fleming Motor Yacht

The ceiling paneling in the engine room had been damaged due to water intrusion . After gaining access to the structural beams under the floor, we scarfed and sistered new material out of white oak.
A new subfloor was installed out of marine plywood and everything was then scarfed and fiberglassed.
The cabin sole was then remade utilizing ¼” thick solid teak and hard maple. A new floor was glued into place with thickened epoxy. The settee was rebuilt and reinstalled. The engine room ceiling panel was replaced with new galvanized perforated panel.
In order to match the existing finish, we then applied 8 coats of varnish using single part epifanes.
The entire cabin sole was refinished with 3 maintenance coats of epifanes including a final coat of rubbed effect epifanes varnish to obtain maximal visual appeal.